Planning matters blog | Lichfields

Planning matters

Our award winning blog gives a fresh perspective on the latest trends in planning and development.

Driving housing delivery from large sites: What factors affect the build out rates of large scale housing sites?
On the day of publication of Sir Oliver Letwin’s final review report, we release some initial findings from Lichfields’ own new research on the build out rates on large housing sites. This updates our award-winning research report – Start to Finish – from November 2016, which won the RTPI Research Award in 2017, and which is a regular point of reference for plan-makers and Inspectors in considering the realism of housing trajectories in local plans and five-year housing land supply statements. Planning for housing involves more than just allocating sites in local plans and granting planning permission for development to take place, although the latter is obviously a pre-requisite. With the National Planning Policy Framework (NPPF) requirement for local plans to identify sites and broad locations over a 15-year timeframe, for local authorities to demonstrate five-year housing land supply, and also be confident that they will pass the housing delivery test, planners nowadays require a much sharper focus on what sites will contribute in practice, and thinking about how they can – in the words of Kit Malthouse MP – do more, better, faster. Sir Oliver Letwin’s review focusses on examining why it is that some large-scale housing sites are not delivering homes fast enough and what can be done to increase the speed of build out. His draft analysis was based on a relatively small number of sites (17, of which 15 had data) primarily in the south of England. This reflects the difficulties gathering good quality information on the build out of sites, and explains why many local plans have consistently over-estimated the speed at which developments come forward and then build out. This reflects that many such developments are inevitably complex to bring forward, with significant upfront infrastructure obligations in many cases. Nevertheless, paragraph 72 of the revised NPPF makes clear the Government view that: “The supply of large numbers of new homes can often be best achieved through planning for larger scale development, such as new settlements or significant extensions to existing villages and towns, provided they are well located and designed, and supported by the necessary infrastructure and facilities. Working with the support of their communities, and with other authorities if appropriate, strategic policy-making authorities should identify suitable locations for such development where this can help to meet identified needs in a sustainable way.” It goes on to require that in identifying locations, plan makers should: “[…] d) make a realistic assessment of likely rates of delivery, given the lead-in times for large scale sites, and identify opportunities for supporting rapid implementation (such as through joint ventures or locally-led development corporations).” To help inform that analysis, Lichfields has assembled an updated evidence base on lead-in times and build out rates, based on the identification of additional sites, and with two additional years of build out analysis (2016 to 2018).   Our updated analysis considers close to 200 housing sites, including approximately 100 large-scale housing sites and a similar number of smaller housing sites for comparison. These were spread across England and Wales, and ranged from 10  to 15,000 homes. Our analysis considered a wide range of factors which might affect build out rates, including levels of demand, the number of sales outlets, and delivery cycles. Our analysis measures the “planning approval period” from the validation date of the first planning application on the site, to the decision date of the first application for dwellings in the scheme (whether full, hybrid or reserved matters); as well as the “planning to delivery” period, that is, the period from the approval of the first application for the development of dwellings and the completion of the first dwelling. The analysis highlights how a site size of 500 units seems to be the tipping point for much longer planning periods (going from 2.3 years to 4+ years, and 5-6 years for sites over 1,000 units). Whilst the planning to delivery period (from planning permission to first completion) is longer for larger sites (on average), this is perhaps less significant a difference than one might expect given the complexities involved. Our research looks at how fast such sites build out once started. The analysis shows the size of a site is one of the key metrics which determines its build out rate. Whilst some very large sites can deliver upwards of 250-300 dwellings per annum for short periods, many sites do not delivery particularly quickly, with the average for sites of 1,000-1,999 homes being around 100 per annum. Nevertheless, sites for over 2,000 homes in our sample delivered on average about twice as many per year than sites of 500-999 dwellings. Our research finds that the average number of outlets on a site over the entire build out period has a relatively strong correlation with average annual build out rates as a percentage of total units on site, suggesting that more ‘flags’ and product have a positive impact on the delivery of new housing – a key initial finding of Letwin’s Draft Analysis too. Our sample of sites with outlet data finds that each additional outlet resulted in an average of approximately four homes being completed per month, although a review of annual reporting for major housebuilders suggests the average is closer to three homes per outlet per month (and that there is surprisingly little variation, albeit that they are national averages and may be counted differently be different housebuilders). Reflecting our original analysis, we also found that very high levels of affordable housing (making up more than 40% of the total units on site) could have a similarly positive impact on build out rates to additional outlets. We also estimate that greenfield sites may build out up to 21% quicker in delivering, for their size, although on average these take 7% longer from first application until the time they deliver. Our findings point to the ongoing need for realism and depth in understanding the rate at which large-scale housing sites build out, and also that the most significant element of the time it takes for such sites to move from conception to delivery remains the time it takes to be granted a full, implementable planning permission. There are clear factors that determine the different rates at which sites build out – notably the differentiation in product, the number of outlets and so on – and the extent to which there are policy levers to pull in speeding up build out once sites have started has been a focus of the Letwin Review. Whilst public sector market interventions – e.g. by Homes England in unlocking sites, or pump priming new infrastructure such as access roads to open up new ‘frontages’ – are already part of the solution, there are limits to the capacity for this type of intervention, and the vast majority of large sites will be privately-delivered. In this regard, interventions will inevitably be via the planning system and how infrastructure is at the very least part-funded via planning obligations and community infrastructure levy for delivering homes. Here, there are risks of unintended consequences of possible planning policy changes that could stall large-scale site promotion, thereby stymieing the necessary investment in up-front infrastructure. If you would like to speak to someone at Lichfields to find out more about our latest research on build out and land supply calculations, please contact Matthew Spry or Rachel Clements.    

CONTINUE READING

All change on local housing need: the standard method’s next iteration
Household projections have been a core input to assessing housing need since at least 1977, when the Housing Services Advisory Group of the old Department of the Environment advocated what it called the total stock/household method. This didn’t change in the initial version of the standard method released last year, which combined these projections with a second input: an uplift based on the affordability ratio (a measure of median house prices versus median annual wages). But for any method to have credibility as a measure of need, the Government needs to be confident its inputs remain fit for purpose. The Government’s new 2016-based household projections, released September 20th, 2018, revised growth across England downwards by approximately 24%, from 210,000 to 159,000 annually. When combined with affordability ratios to form the standard method set out by Government in September last year, they appear to wildly underestimate the number of homes needed in some areas. These include local authorities with severe affordability pressures, particularly those in London and the South East such as Essex, Hertfordshire, Buckinghamshire and Surrey; as well as ambitious urban areas in the Midlands and the North - where adequate housing is needed to support economic aspirations; and areas with both affordability and job pressures such as Oxford, Cambridge and Milton Keynes. For example, for Hertfordshire and Essex, the new household projections produce a standard method figure some 3,215 homes lower than previous estimates up to 2028, which could jeopardise plans being brought forward jointly for three new garden communities. Surrey too saw a reduction in its standard method figures of close to 32% over the next 10 years. Further north, the Greater Manchester Spatial Framework currently sets out a target of 227,200 homes to 2035, but the new Local Housing Need (LHN) figure estimated from the 2016-based household projections would be 73,600 homes less than that. Similarly, the Government has proposed a target of up to one million new homes across the Cambridge-Milton Keynes-Oxford (CAMKOX) Arc, but under the current standard methodology, delivery could be just 70% of that to 2050. These gaps in delivery against planned targets add up to a significant potential shortfall when compared with the Government’s stated aim of delivering 300,000 homes per annum by the mid-2020s. One reason why the affordability uplift was included in the standard method was because this approach allows Government to ensure areas with the greatest problems of affordability carry the greatest burden of increasing the supply of new homes. The hope is that this will help to ease affordability pressures, and by extension, increase rates of household formation. There is extensive evidence that a sustained boost of supply nationally in the order of 250,000 - 300,000 per annum, with bigger uplifts in the least affordable locations, will – alongside other measures – boost affordable supply in the areas that most need them, and also help to moderate the growth of house prices relative to earnings growth, thus improving the relatively affordability of housing. The chart below demonstrates why this adjustment is necessary: the revised household projections would, without adjustment, suggest that many areas with very high affordability would have LHN figures that imply they should not build as many homes as indicated by previous projections. Indeed, there is a slight positive correlation between less affordable areas and greater reductions in the revised household projections, which could reflect the downward pressure on population growth and household formation rates created by high affordability ratios. Figure 1: Correlation between household projection revisions and affordability ratios Source: ONS, Lichfields analysis Note: Copeland, Richmondshire and Blackpool removed Indeed, areas with the most extreme affordability ratios, i.e. those local authorities where average house prices were more than 10 times local earnings, highlighted in the figure above, have among the biggest reductions in household growth compared with previous projections; alongside areas with the lowest affordability ratios, suggesting much less demand. And in some locations - many highly unaffordable - the new projections create seemingly perverse results; for example negative levels of household growth in Cambridge, and de minimis growth in Oxford[1]. If the result of the new projections was to reduce the amount of housing planned for in those areas, that would clearly be counterproductive to the public policy goal of increasing housing supply in the least affordable areas, and would make the 40% cap on the level of uplift similarly difficult to rationalise. For areas not experiencing extreme affordability pressure, but which may have a need for housing for other reasons, such as employment, there is nothing in the standard method formula to account for this. However, the NPPF 2018 sets out clearly in Paragraph 81 the need for planning policies to “set out a clear economic vision and strategy which positively and proactively encourages sustainable economic growth…[and] seek to address potential barriers to investment, such as inadequate … housing”. Furthermore, recently updated Planning Practice Guidance (PPG) on Housing need assessment makes explicit that “The Government is committed to ensuring more homes are built and are supportive of ambitious authorities who want to plan for growth.” It goes on to establish that the standard method is only a minimum starting point, and circumstances may arise where actual housing need may be higher than the standard method figure. The PPG provides specific examples including where growth strategies and Housing Deals are in place, where need may be higher, as well as a range of back stops, including past delivery levels and recent SHMAs, which should prevent new, lower household projections unduly influencing housing targets in forthcoming local plans downwards. This guidance perhaps lacks the ‘bite’ that some in the sector have been seeking to militate against what some local authorities have been doing: using the standard need method to reduce their estimates of housing need (examples include Richmondshire[2], Wirral[3] and Great Yarmouth[4]). However, local and strategic plans will be examined on this basis from January 2019, and they could face difficult examinations if their plans have a clear disconnect between ‘do minimum’ housing plans and ambitious employment growth visions. More generally, we know the Government will be consulting on revisions to the standard method to recalibrate its approach to get back towards the 300,000 homes per annum figure. The question remains as to how they propose to do this. It will be important they get it right – it will be local plans produced over the next 2-3 years that will allocate the sites that will be delivering homes in the mid-2020s and thus be critical in meeting the Government’s aspirations.   [1] https://lichfields.uk/media/4495/lichfields_the_2016_based_household_projections.pdf[2] https://www.planningresource.co.uk/article/1492059/yorkshire-council-moots-slashing-annual-homes-target-180-15-wake-standard-method[3]  https://www.planningresource.co.uk/article/1493928/threatened-wirral-council-rows-back-green-belt-releases-wake-new-household-projections[4]https://www.planningresource.co.uk/article/1491854/norfolk-council-proposes-2000-home-housing-target-cut-wake-new-standard-method  

CONTINUE READING